Paid
459 Main Street
Suite 101, Box 379
Trussville, AL 35173
brandon@fullforcehvac.com
Invoice Number | INV-0009 |
Invoice Date | May 25, 2023 |
Total Due | $0.00 |
Repair for 4024 Lennox Rd. Called Ridge on site and he came over and verified compressor burnout and systems needing maintenance. Approved price on site.
Hrs/Qty | Service | Rate/Price | Adjust | Sub Total |
---|---|---|---|---|
1 | Install New Compressor Includes install of new compressor, triple vacuum, soldering and pressure testing |
$1,825.00 | 0% | $1,825.00 |
1 | Acid Scavenger Eliminates any residual acid that may be in the lines from the burnout |
$0.00 | 0% | $0.00 |
1 | Compressor Wire Harness Previous harness was melted from burnout |
$0.00 | 0% | $0.00 |
1 | 35uf Run Capacitor Run capacitor for compressor failed |
$0.00 | 0% | $0.00 |
4 | 410a When compressor failed it blew the plug out of the compressor and discharged all the freon |
$0.00 | 0% | $0.00 |
2 | Maintenance Chemical wash both outdoor units, clean drain line with bleach to prevent blockage that may cause flooding. Change 3 indoor air filters, check temps, pressures of both systems |
$0.00 | 0.00% | $0.00 |
Sub Total | $1,825.00 |
Tax | $0.00 |
Paid | -$1,825.00 |
Total Due | $0.00 |