Paid

Invoice

From:

459 Main Street
Suite 101, Box 379
Trussville, AL 35173

brandon@fullforcehvac.com

Invoice Number INV-0009
Invoice Date May 25, 2023
Total Due $0.00
To:
Kadco Homes

Repair for 4024 Lennox Rd. Called Ridge on site and he came over and verified compressor burnout and systems needing maintenance. Approved price on site.

Hrs/Qty Service Rate/PriceAdjustSub Total
1 Install New Compressor

Includes install of new compressor, triple vacuum, soldering and pressure testing

$1,825.000%$1,825.00
1 Acid Scavenger

Eliminates any residual acid that may be in the lines from the burnout

$0.000%$0.00
1 Compressor Wire Harness

Previous harness was melted from burnout

$0.000%$0.00
1 35uf Run Capacitor

Run capacitor for compressor failed

$0.000%$0.00
4 410a

When compressor failed it blew the plug out of the compressor and discharged all the freon

$0.000%$0.00
2 Maintenance

Chemical wash both outdoor units, clean drain line with bleach to prevent blockage that may cause flooding. Change 3 indoor air filters, check temps, pressures of both systems

$0.000.00%$0.00
Sub Total $1,825.00
Tax $0.00
Paid -$1,825.00
Total Due $0.00